Dumbbell chart maker

Pick an indicator, two years and the countries: each gets one row, a dot for the first year and a mark for the last, so the length of the line is the change.

Open the dumbbell example

Women in the labour force, 2005 to 2025: Malta's gain of 25.9 points leads.

What you get

Arrow or dot
End each row with an arrowhead or a second dot, and choose whether falls show in red.
Ranked by the change
High first leads with the biggest rises, low first turns the order round.
One shared axis
Every row sits on one axis, and it need not start at zero.
One accent
The first country in the list wears the gold highlight and the rest stay quiet.

Questions

What do I get from the dumbbell chart maker?

One row per country between two years you choose, from the built-in data, with the source printed under the chart.

Is a dumbbell chart the same as an arrow chart?

In GeoLens one chart makes both: each row ends in an arrowhead or a second dot on the last year.

Can I make a slope chart?

Use the dumbbell: it shows the same two years per country, laid flat and ranked by the change, so long labels stay readable.

Is it free?

Yes. The editor opens without an account; a free account saves and downloads. Free: charts, all 10 types, world map explorer, every built-in indicator, publish and embed, 10 saved pieces. PLUS adds videos, private artifacts, shared by link, background photos and your own images; PRO adds 5 brand kits. Compare the plans